The following log details the termination procedures undertaken at Site-96 on designated day Zeta. The primary objective of the operation was to neutralize a subject classified as Keter designation. Initial reports indicate that the termination protocol was unsuccessful with minimal collateral damage. Subject containment breach occurred at approximately cycle delta 18. Further investigation into the incident's source is ongoing.
- Notable personnel during operation: Dr.Last Name Redacted, Dr.Last Name Redacted, AgentID number Redacted.
- Primary tools utilized in termination:: M-Class weaponry, dimensional anchor.
Additional information will be released upon completion of the official investigation.
Euclid Containment Breach - Site 96
On 04/23/YY| During early hours, an anomaly occurred at Site 96, resulting in the breach of Euclid-class entity SCP-ZZZ. Initial reports indicate system malfunction as the primary cause. Security personnel were immediately dispatched to the affected area and engaged in a hostile confrontation.
- The breached entity exhibited altered behavior patterns, posing a potential threat to surrounding infrastructure and personnel.
- Initial containment protocols were implemented with varying degrees of success. Further investigation into the cause of the breach is ongoing, with on-site technicians currently at work.
- Information blackout| The Foundation has issued a official press release outlining the containment procedures.
Unit Delta-7: : Location Ninety Six Protocol Engaged
A hostile force has been detected within Sector Ninety Six. All personnel are to assume combat positions and await further directives.
Unit Delta-7 is to engage {Site Ninety Six Protocol{ immediately. All resources are to be allocated as needed.
- Maintain radio silence unless absolutely necessary.
- Log all observations immediately.
- Be on guard at all times. This is a level 5 emergency.
Analysis of Site-96 Anomalies
A comprehensive review of the anomalous occurrences at Site-96 has been concluded. The initial findings indicate a complex and mutable system exhibiting traits consistent with non-Euclidean activity. Supplemental research is essential to elucidate the nature and goal of this anomaly.
- Key findings:
- Unexplained electromagnetic anomalies
- Interdimensional rifts
- Cryptic audio transmissions
Proposed actions include enhanced surveillance of the site and deployment of a dedicated research team. Containment procedures should be reviewed to reflect the evolving nature of this anomaly.
Perimeter Security Protocol: Site 96 Activation
A full lockdown has been activated within Secure Zone Alpha-2, check here specifically at Site 96. All personnel are to remain to designated safe areas and avoid all non-essential operations. External access to the site has been strictly prohibited. Any unauthorized entities attempting to breach the perimeter will be handled according to protocol.
Preliminary intelligence suggests a potential incursion. The situation is being actively monitored by security forces, and updates will be provided as they become available.
Remain calm, follow all instructions from authorized personnel, and cooperate fully with the ongoing investigation.
Inquiry into Anomalous Signal Originating from Site-96
Preliminary analysis of the anomalous signal detected at Site-96 indicates a probable source originating from deep within the complex. The signal, characterized by irregular modulations in electromagnetic spectrum, has exhibited distinct intensity peaks at specific harmonics. Measures are currently underway to pinpoint the exact location of the signal and determine its type. A squad of specialist researchers, including cryptographers, physicists, and forensic scientists, have been deployed to Site-96 to conduct a thorough scrutiny.
- Early findings suggest the signal may be synthetic, though further study is required for verification.
- Security protocols at Site-96 have been tightened in light of the anomalous phenomenon.
- Admission to the site is currently restricted to authorized personnel only.